Not Ranked
If you do have to cut the floor and pour a thicker slab, be sure to tie it into the existing slab with rebar. If you don't, that new pour will float relative to the existing slab and you will have all kinds of problems. The rebar should be on 6 to 8 inch centers.
__________________
John Hall
|