Things are really starting to take shape now. Most of the frame is up. This morning they installed the roller doors. The door in the center bay is a 3M wide by 3.5M high opening so I can get a truck in there.
The wind was really picking up this morning (we are on the top of a hill) so I don't think they will have got much done today.
Cheers