Nope, HVAC work day... These 105 deg days are tearing me up.
Tomorrow's looking much cooler than last Sunday. I'll be on it like stink, right after breakfast.
I'm planning on doing a couple pressure tests, right side of the engine then the left. I've got to jerk the water pump and finish the fabrication of the block-off plates. Nitrogen again will be the medium of choice to pressure test, each side to 20 psi this time. I'll check all connections for tightness and watch to see what the pressure does. Rate of loss (hopefully none) will be compared, right to left.