View Single Post
  #1203 (permalink)  
Old 01-06-2011, 05:53 PM
Double Venom's Avatar
Double Venom Double Venom is offline
CC Member
Visit my Photo Gallery

 
Join Date: Nov 1999
Location: Pentwater, Mi
Cobra Make, Engine: Professional Cobra & Streetrod Builder
Posts: 5,352
Send a message via AIM to Double Venom
Not Ranked     
Default

OK,
First of all the firewall has to be repaired and strengthened due to the large cut outs for the CR pedal assembly and booster. On the inside of the firewall I plan on using a 10 ga. piece of aluminum, having it formed/bent to match the top and front of the firewall. Since the Wilwoods actually bolt through the firewall this will be more than ample to support any Heavy Footed driver!

1. After the new plate is installed the pedal assy's get bolted. Then the master cyl's get mounted to the pedals, THE PLASTIC CAPS are then installed with compression bands on the MC's. They receive the fluid from the Billett containers, then to the clutch MC and wheel cylinders via stainless braided lines.

Piece of cake
Mounting the reservoirs - stay tuned for that one!???

Last edited by Double Venom; 01-07-2011 at 07:17 AM..
Reply With Quote