All done Dave. An impressive product. Has a 2 pack epoxy base, flake and then 2 pack urethane top coats. Very tough stuff and resistant to almost every fluid known to man. Can be driven on in 24 hrs but I will wait 48.
The cost was about $800 more than I could buy the materials for and included a diamond cut re-surfacing of the concrete, acid wash, etc. Was (only) 38 sqmtrs.