View Single Post
  #93 (permalink)  
Old 02-27-2011, 09:16 AM
RestoCreations's Avatar
RestoCreations RestoCreations is offline
CC Member
Visit my Photo Gallery

 
Join Date: May 2010
Location: Birmingham, AL
Cobra Make, Engine: Kirkham 289 FIA, 363 Stroker
Posts: 751
Not Ranked     
Default

Oh, just a few things left to finish.

1. Front and rear parking lamps-waiting on connectors *
2. Steering-waiting on intermediate shaft *
3. Carpet *
4. Drivers and passenger seats-waiting on seat and seat tracks
5. MSD connections-going to need to spend some time on the phone with tech support
6. Button up wiring to frame rails
7. Fuel pump
8. Engine and trans-Engine should be ready the week after next if the piston rings arrive early this upcoming week. *
9. Fuel pressure regulator
10. Solenoid
11. Horns *
12. Radiator and fan *
13. Roll bar bezels/grommets
14. Remove windshield, cut rails, and reinstall with gaskets under trim plates
15. Trunk latch *
16. Hood latches *
17. Rivet hood in place with correct Rivets
18. Install fuel tank *
19. Install fuel lines
20. Differential breather *
21. Headers and sidepipes-Still trying to decide what to do with pipes-white or stainless.
22. Battery
23. Alignment/tuning
24 Seat Belts

For the most part, i am simply waiting on parts. Stars indicate parts that i do not have, but that should arrive soon. I will probably knock out the rest of the wiring, the windshield, and remove the remaining old, dry, smelly carpet this upcoming week.
Reply With Quote