The body mold is done and the second "Slabside" is up at Tony's getting a paint job (with the owner to take the car and build it up after paint). The welding shop is to start on chassis "3003" this week. Wire wheel hubs are on the "shelf". So production is underway. Peter indicates that he has a half dozen deposits on the slabside and more to come once folks know the car is in production.
Jim