Not Ranked
Thanks guys.. I too thought that the last foot should be a flexible connection of some sort. Maybe a short foot of braided flex as well.....AN-6 hose to male 1/4 npt
I am likely running a length of 3/8 armor flex style prefab brake line upto this point fom the tank. I guess I could run it into a pipe union 1/4 to 1/4 NPT and then mating the brake line and its associated fitting to the AN style hose fitting running to the pump inlet.
Marc I am planning the hole run using the 1/2 or 3/8 size pico clamp with 10/32 machine screws every foot or so. Drilling and tapping the frame for this run and the brake lines as well.
Tim
Last edited by Whaler; 01-27-2002 at 10:50 PM..
|