Thread
:
It has begun - G-Pete's 289FIA Scratch Build
View Single Post
#
44
(
permalink
)
04-26-2011, 10:05 AM
G-Pete
CC Member
Join Date: Dec 2010
Location: Allen, TX
Cobra Make, Engine: Werk77 289FIA
Posts: 1,295
Not Ranked
Upper frame progress
The cross square tube stays in place until the body mounts are welded in
Front end of the frame prep
Body mounts fiber-glassed and the tabs tacked to the pipes
Front end and upper main are done
Progress on the back bone and tranny brace. The SVT IRS modified and locked in the final position
G-Pete
View Public Profile
Find all posts by G-Pete