View Single Post
  #3 (permalink)  
Old 06-07-2011, 02:26 AM
suthol suthol is offline
CC Member
Visit my Photo Gallery

 
Join Date: Apr 2011
Cobra Make, Engine:
Posts: 79
Not Ranked     
Default

Quote:
Originally Posted by Treeve View Post
Why not just fix the Applicable ADR's in the NCOP (i.e. prevent them from 'updating' the applicable ADR without updating the NCOP document) and say "righto, this is what you have to build to until the next version of the NCOP is sorted", and go from there, and then get a build number and VIN number assigned to a particular version of the NCOP (i.e. NCOP version 2, NCOP version 2.1). Same idea as yours, but gives a greater than 4 year window.

I like the idea of getting the ADR versions that are applicable set in stone at the start of the build though.
This.

The only issue I see with them accepting this one will be needing to conform with all the other states if they want to change the guidelines.

Poor little bastrads
Reply With Quote