Month going by fast...dang.
It's been a while, got my fuel cell now and tossed completely the idea to use the donor tank.
The front suspension is done and I'm working on the rear. This will be the subject on the next update.
The power plant is close to be completed.
The mayor replacement components were: Water pump, dampener, belt tensioner, power steering pump, spark plugs and water/
oil adapter gasket
Upgraded replacement parts: High volume
Oil pump, crank shaft dampener, 39# Injectors, 78mm intake plenum/throttle body, 7 quarts
oil pan, modified for fit between the frame rails - "lost" 8oz; and the aluminum valve covers.
Last and not least the ATI super charger Stage 3.
Next weekend I will be back on the frame and put that engine in so the foot boxes and all the other stuff can be measured and fabricated. It have been gotten hot very soon here ---100F pffffffffff..........