Not Ranked
Nice Job Baz,
I've an RMC and my engineer (now retired due to the ridiculous RTA changes ) was very familiar with all the RMC chassis 'versions' from single rail to double rail. He was happy with my chassis (double rail) as well as being very conversant with the 'Original' staff at the RTA in Sydney. At that particular time (2002) my engineer was talking of these crazy changes and that the old school management of the RTA would disappear and bad changes would occur with no improvement to the engineering process.
He was right. This particular engineer took a great interest in my project as he does with others. He is genuinely interested as it is his hobby as well as a job. A lot of engineers are just doing a job. There is talk of a total reconfigure of the RTA itself and this may help or hinder the ICV industry. Interesting times ahead for NSW
|