Not Ranked
this is a trial upload--if it works notice the 2 pieces of heavy metal to internal balance this crank
On this pic of a rear counter weight you can see two pieces of mallory heavy metal installed into the crank and then a drill point drilling to remove what was then excessive weight--
Engine shops have charts of the weight of drilled holes, weights of different sizes of mallory AND then the differances of the weight of the removed iron and installed mallory--besides the numbers of the hole sizes, its important to know the weight of the mass removed by the POINT of the drill also---and of course theres a differance in 118and 1358 points
Last edited by Jerry Clayton; 12-10-2011 at 07:41 AM..
|