View Single Post
  #1 (permalink)  
Old 05-07-2013, 06:00 AM
400TT's Avatar
400TT 400TT is offline
CC Member
Visit my Photo Gallery

 
Join Date: Jan 2004
Location: Gold Coast, AUS
Cobra Make, Engine: Wish I had my own PACE 427
Posts: 2,145
Neutral     
Default New Absolute Pace Facility

Been a litte busy with setting the new factory up and haven't had much time to visit the forum.

We have now fully moved into our new facility at 23 Demand Avenue, Arundel. Contact phone number remains the same at 07 3103 0957.

The new facility is just over 1800sqm (19000sqf) and gives us a large showroom area and offices, substantial lock up yard and a few free standing sheds with the ability to separate work areas and operations.

There are 4 main areas in this facility:

Office/Showroom Area
Assembly Shop (all component assembly and servicing work)
Composites Shop (fabrication of our fibreglass and carbon parts)
Fabrication Shop (fabrication of aluminium & steel components e.g. chassis)

Also many smaller functional areas:

Aluminium Body Prep Room
Machine Room
Hardware, Electrical & Fasteners Room
3 Main Parts Storage Areas
Engine Assembly Shop
Body & Chassis Assembly Area
Chassis Testing Area

We have 9 full-time and 5 part-time employees. I am very proud of the diverse and high skill level we have with our team.

We are currently producing 3 x different kit cars - PACE 427, PACE GT & PACE Skeleton. We also distribute and customise the Kirkham products for registration here.

I have attached some photos, enjoy.
Attached Images
     
__________________
www.absolutepace.com

Last edited by 400TT; 05-07-2013 at 06:11 AM..
Reply With Quote