Once the body is all shiny and sexy they start doing all the fitment work, most if the stuff is fitted for a trial fitting before being pulled apart again to do all the wiring on a rotisserie..
[/url]
As part of this process all the engine bay firewall is inserted along with foot boxes. The foot boxes in my car are aluminium as well the standard Kirkham is fibreglass.
[/url]
Then they install all of the heat shield to the fire wall.
[/url]
Then the cabin wiring is installed.
[/url]
Most of the wiring for the car is done while the car is on a rotisserie at least this beats working over head on a hoist or laying on your back doing it all.
[/url]
[/url]
[/url]
[/url]