I'm going to use acetone to clean the surfaces this time and maybe try Right Stuff between the top gasket and block, and bottom gasket and pan. I was looking at the instructions for Right Stuff and it says everything needs to be put together and torqued in 5 min. Considering there is a windage tray,
oil pickup, and about 20 bolts and studs to assemble, how is it even remotely possible to get everything torqued in 5 min? How do you use this stuff when there is a lot to assemble?