View Single Post
  #308 (permalink)  
Old 09-20-2015, 05:35 AM
stephen low's Avatar
stephen low stephen low is offline
CC Member
Visit my Photo Gallery

 
Join Date: Aug 2001
Location: Melbourne, Australia, Vic
Cobra Make, Engine: G-Force Mk I, 5L Windsor, TKO 600, enhanced Jag / Koni suspension & LSD Diff.
Posts: 2,300
Not Ranked     
Default More progress

So still a bit of an interrupted weekend but got some reasonable progress on my driver footwell kick panels.

By the end of Saturday night I'd fitted up two panels as shown and test fitted the third panel for match into the second. Suffice to say I wasn't happy with the match up and decided to rework a second panel variant.



So Sunday's first job was the number 2 panel remake and refit.

I was a happier boy when I fitted up panel number three and though not perfect, was adequate to pass muster as shown below.



This exercise essentially consumed all the day.

I'll need to trim the panel at the door opening and match up to a panel under the door and then that's it for folding of cabin kick panels.

I do also need to tidy up along the top folds, cut out holes for a speaker and a couple of footwell LED lights and make the two cover up panels for the bonnet lever and behind the pedals.

With this work done the kick panels will be done.

That just leaves the gear lever cover plate and the cabin aluminium is finally done. But I guess this is going to take a bit of time.

Enjoy
__________________
slowy
Reply With Quote