Quote:
Originally Posted by RockBit
Good thought. If I can get the template for the lift before I have the floor poured, it would be better to set the j-bolts than hammer drilling the holes.
|
Make your own template easily. Just put a piece of plywood under the base plate and mark the holes. Then drill the holes in the plywood and double-nut the anchor bolts to it. Drop it into the footing and suspend it with some 1/2 or 3/4" strips across the hole. Center and square it and pour the footing. Just measure, then measure again!
