So with some time before trailering to the trimmer work has continued.
Work has mainly been in the boot. Fitting closures around openings such as the main boot floor access above the fuel tank, around the fuel filling and breather pipes and on the parcel shelf around the seat belt post.
But have also been shielding the wiring to the amp both to separate the main power and ground and to protect the general wiring. Need to revisit that outer cover and make it longer but that's some simple metalwork.
Was also on a bit of a mission and got the car to the point of needing some alignment check so back on its boots for the first time in a long period.
And then started to set up for a string line check, that worked well. Or at least seem to!
With that work done the car was driven into the driveway for a clean of all the accumulated dust of the past half year.
A good milestone reached.