Quote:
Originally Posted by RockBit
It will be a 'roller', so it will have all suspensions, wheels, steering, and tires. The roll bar and bumpers will probably be installed.
I will need to install engine/transmission, interior, pipes, and do some wiring. I'm not sure what else.
|
Well, it will depend on how many hours a week you put in on it and if you have gathered all the small pieces and materials you need to complete the job (insulation, engine accessories, etc). I would guess that with putting in a lot of hours a week (weekends and evening after work) it could be up and running within a couple months. With a more leisurely schedule - maybe 6 months.