Ive finished the locks off and bonded the frame to the hatch. Was about to knock up a frame to mount the top to and start on all the body work and "paint", but got a little sidetracked making a bit more room in the garage.
I need to cut a little pocket in the ceiling so I can get 1.8m clear underneath, right on 1.6m now. Lots of shelving that Ive filled with crap already - need to spend a day filtering through it and I reckon I could free up half the space Ive used. Shelving was from "Storage Sam" (Google them) - Highly recommended if your in Sydney.