View Single Post
  #45 (permalink)  
Old 08-21-2018, 08:29 AM
CarGuy427 CarGuy427 is offline
CC Member
Visit my Photo Gallery

 
Join Date: Mar 2014
Location: Parma, oh
Cobra Make, Engine: ERA 427 FE Shelby aluminum block, dual quads on Dove high rise, 5speed Tremec
Posts: 39
Not Ranked     
Default

The first car I did was completed in 97 and as I remember it took about two years, and was a complete turnkey. My second turn key car was finished in 2004 and also took about two years, to the best of my recollection. Actually, I think the second car was two years and a few months as it was a bit more complicated. Part of it is just timing I think and I am in no hurry. My drive season is pretty much May to September so have a limited window. No sense pushing a build to receive the car in December, at least in my thinking. Gives me something to look forward to besides the trees turning green next spring.
Reply With Quote