Been working on installation of the fuel lines, both the main supply, and the return line.
Installation looks quite neat in the tunnel but with no hoist to use, it took a bit longer to fit the lines. The tunnel is closed in for some of its length for torsional strength of the mono, so access is a challenge.
I countersunk the screw heads on the top side of the tunnel, and I have a sheet of 16g alum. alloy to be fitted for appearance.
Here's the view from below decks....
Cheers,
Glen