Well, I'm pretty certain I know how to install all of it, but.....There are a couple gray areas.
1. The electrical valve...Which end is attached to the sump? I see an arrow for flow, but is the arrow to be pointing at the sump or away?
2. The T fitting has one end that attaches fine to the check valve, and the opposite end attaches to my lines fine, but wouldn't you know it....It doesn't attach to the electric valve fitting. Too big. Do I have the wrong T adaptor, or just need another adaptor to go between the valve and the T adaptor (seems stupid).
3. How do you pre
oil the preoiler? I am assuming you just add the
oil, and then put pressure in the sump.
4. How much pressure do you put in the sump?
Thanks for your help fellas.