Not Ranked
I, too, have had my floor for about 4 weeks and am very happy. I seem to remember the instructions stating to apply the sand before the clear coat. Check that, I may be mistaken.
My 24 X 30 shop was completed by myself in 3 days but only because of the weather and drying time. When starting, I thought I had something wrong. Some of the guys here made suggestions and helped me along the way. Do a search for "Immediate help with UCoatIt needed" and it will bring you to the thread. Sorry, I don't know how to attach a link. The thread has several tips not in the lit. Some of these tips came from UCoatIt.
Chaplin - Glad to see your weather finally broke and gave you the time to apply. Did you have the product shaken by a machine before applying? They told me at UCoatIt that if it sits for a month, I'd be better off having it done.
Cobaby
Last edited by Cobaby; 07-01-2003 at 10:02 PM..
|