Not Ranked
To take a customers bar castings and run our CNC program with the right valve job for application, back-cut the valves tp proper angles, sand roll the chambers and runners then cc them and mill to desired size would run 2200.00. I have been using 2.25/1.75 Fearra 11/32 valves and changing the guides. I have done several sets with the 2.19/1.75 3/8 stem valves as well. I find the larger stem valves to work fine on the lower lift type engines that are running about .600 lift, when we are doing a all mout race engine we use the other 11/32 valves for durability and less weight. Hope this helps a little. The 2200.00 is for labor only with no parts. Thanks Keith
__________________
Keith C
|