Not Ranked
What gauge should I have used? I will check it when I get home.
A new trench is NOT an option. There is now 50+ of concrete to go under, a drainage system and 125 feet of yard.
Can I take one of the existing curcuit, change it to 220 and then split it to 220 and 110 when it gets to the garage? What about the fact that I buried 4 conductor wire and not 3 conductor wire?
Thanks
Rick
|