Bruce,
When we receive 10 deposits for the slabside, or 10 deposits for the FIA we will begin to build the tooling. We will begin the tooling as soon as we receive the deposits.
Currently we are using Trigos, but we will soon be making our own rims as well--all in an effort to bring down our costs.
David