Not Ranked
Quote:
Originally Posted by CSX 4027
Tools required
1 inch steel square tube stock
3/4 inch steel round tube stock
5/8 inch grade 8 bolts/nuts
1/4 inch steel slat stockFender washers
Welding ability
3 hrs
You first mock up the seat into position with 2x4 wood blocks then determine either floor mount or seat track mount.
The rest will be detailed in diagrams and pictures but, experience in welding is a must.
|
With the work needed to build ,I guess the mounting frame, or whatever, is your seat considered a "kit" seat, and not a "real" seat ?
__________________
"After jumping into an early lead, Miles pitted for no reason. He let the entire field go by before re-entering the race. The crowd was jumping up and down as he stunned the Chevrolet drivers by easily passing the entire field to finish second behind MacDonald's other team Cobra. The Corvette people were completely demoralized."
|