Just get it done.
To beat the changing ADR requirement, and due to the late delivery of the body and chassis, we had our Cobra doing it high speed brake tests at Oran park in 6 weeks.
It was all preped though all the parts were ready engine wheels etc when the chassis arrived.
The car was fully engineered in about 3 months.
However the car was assembled to satisfy the engineeer, nothing more but possibly a few things less.
It then took 4 years to build it how I wanted it, but I did get to drive it while the rebuild was on.
Phil