DV,
I just called my rat rod guy about the control arms. He's still thinking they will be done this week. If he does come through on his word
I'll bring them with me on Saturday, but we'll have to use your powder coating guy. There's no way my guy could turn these around so late in the week.
Here's what I'm bring over this coming Saturday.
1) Engine
2) Tranny (with shifter)
3) Headers and side pipes
4) Radiator
5) Overflow tank
6) Gauges
7) The Flaming River stuff (drop bracket, u-joints and shaft)
Ed