Sat: Frame is halfway back to being boxed in-motor went in one more time, (and back out- see I told you I use that lift a lot!
) everything now fits and lines up. I did a liltle trick to the kickdown lever so it wouldn't use as much room. everything looks good. Hope to drop the motor in yet today. Motor mount and final asembly of the installation tomorrow, Dash is totally assembeled including the glove box.
DV