Not Ranked
Thanks
Yes the power valve were never machine out. It has two idle circuit adjustment screws on the primary side. There are no 134's numbers on the metering blocks.
It has 80 jets on the primary side and 81's on the secondary.
Could I have the casting machined out for the power valve on the primary side? And go back to the smaller jets on that side (71).
Ron
|