View Single Post
  #3 (permalink)  
Old 12-07-2008, 09:17 PM
gjkrv8's Avatar
gjkrv8 gjkrv8 is offline
CC Member
Visit my Photo Gallery

 
Join Date: Apr 2008
Location: Melbourne, VIC
Cobra Make, Engine: Classic Revival CR 3505, LS1, T56 6 Speed, VE 3.45 LSD Rear, 6 Spot AP Fronts, 4 Spot Wilwood Rears
Posts: 1,121
Not Ranked     
Default

Quote:
Originally Posted by boxhead View Post
Well done Gregg, I reckon you are about the fastest turn around from kit to engineering I have heard of.
Thanks Dave, although I cheated a bit by getting a rolling chassis. I can appreciate the amount of work from bare chassis to rolling chassis and the time it would take. For me it was about 2 months (of continuous late nights and weekends) from rolling chassis to engineering. Although I spent 5 months accumulating parts prior to the arrival of the rolling chassis, so the assembly would be quicker.

Rgds
Gregg
Reply With Quote