These are just a few pictures pertaining to the tubing and fuel lines runing down the drivers side. This IS NOT the finished version. The tubing will be covered that runs through the foot box.
About the shear point----Yes that is going to be refabricated, (a 3/8 plate on the outside of the frame should take care of it) because I had to move the motor mounts back 1 1/2" along with the motor to have room for the AC and PS units.