Well kids, the lift is all fixed. Another fine $500 of parts and labor.
But, I will be able to work on three trucks this weekend...using the lift.
The list of chores is growing. I haven't turned the garden yet and here we are deep into seed planting. The water tower poles are in, but the tank and plumbing all needs to be done. There are a dozen trees that need attention. There is a collector and controller in my lab that need to be built and verified before they are installed. And the list goes on and on.
Dang, I am going to need a vacation so I can do more work.
The Cobra is healthy. Fired up after I cleared the fuel line. I was ready to take it out. Too much mud.