Guy's,
As the Daytona paint/rebuild is a bit slow at the moment I have been able to get on with the Garage build (thanks to SNAKEN for removing all my tools and mechanic's stuff from the shed, as I am still on 1 leg
).
What a nightmare building is,,,,,, everything needs to have a permit, 3 quotes (dont they vary) tradies that dont want the work or refuse to quote.
Before
During
After
The big stuff arrives next week to remove 200CM of soil and dig the footings, 3 phase and gas line tunnels.
I reckon the Garage and Daytona will be ready for Xmas 2009.
STIFFY