Club Cobra GasN Exhaust  

Go Back   Club Cobra > Club Forums > Arizona Cobra's

MMG Superformance
Nevada Classics
MMG Superformance
Main Menu
Module Jump:
Nevada Classics
Nevada Classics
MMG Superformance
Keith Craft Racing
Advertise at CC
Banner Ad Rates
Keith Craft Racing
MMG Superformance
MMG Superformance
MMG Superformance
November 2024
S M T W T F S
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

Kirkham Motorsports

Reply
 
LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old 01-26-2004, 03:53 PM
CC Member
Visit my Photo Gallery

 
Join Date: Oct 2001
Location: Arizona,
Posts: 855
Not Ranked     
Default Anybody in the concrete biz

Well I have been pricing contractors and it comes to about $2.50 sq ft.

Anybody poured their own?


I am looking to do about 1,200 sq ft at 5 inches deep (30' X 40") for a garage. How much savings is there to order and have the truck come dump it and a person doing their own rebar and forms?

This seems a bit more than just digging a hole and pouring some cement in.
__________________
What is your local Socialist Group planning now?
Reply With Quote
  #2 (permalink)  
Old 01-26-2004, 04:18 PM
CC Member
Visit my Photo Gallery

 
Join Date: Oct 2001
Cobra Make, Engine:
Posts: 1,555
Not Ranked     
Default

If $2.50 sq' includes poly, #57 stone, form boards, rebar, rewire or fiber, 3000 psi readymix, digging footings, and pouring/finishing, you're getting a great deal. I pay $2.90 for a turnkey slab, $1.55. for driveways, sidewalks, and patios.
Reply With Quote
  #3 (permalink)  
Old 01-26-2004, 04:19 PM
CC Member
Visit my Photo Gallery

 
Join Date: Jun 2003
Location: ALBUQUERQUE, NM
Cobra Make, Engine: West Coast Cobra weber fuel injected 557 C.I.. 800H.P 760LBS. TQ. Magnum T56
Posts: 330
Send a message via AIM to MAXVELO
Not Ranked     
Default $250 HOLY COW!!!!

For $2.50 have them do the whole Damn thing. Im a Contractor in Albuquerque New Mexico and you are getting a hell of a deal for $3.00 over here. With the amount of work you have to do you'll be wishing you had them do the whole thing about 1/2 way through.
__________________
WHEN YOU HAVE MORE HORSEPOWER THAN YOU NEED ITS STILL NOT ENOUGH!!!!!!!

Last edited by MAXVELO; 01-26-2004 at 04:23 PM..
Reply With Quote
  #4 (permalink)  
Old 01-26-2004, 04:20 PM
mikiec's Avatar
Senior Club Cobra Member
Visit my Photo Gallery

 
Join Date: Jun 2000
Location: Gilford, NH
Cobra Make, Engine: FFR 302 carb
Posts: 8,121
Not Ranked     
Default

Jason,

When Ginny gets home I'll have her look up thr number of the crew that did our patio and get you the number. Or, call Jack and Barb. I used their guy. Good price and service.

Mike
__________________
All gave some; Some gave all. Rest in peace my brothers.

http://s210.photobucket.com/albums/bb222/mikiec66/
Reply With Quote
  #5 (permalink)  
Old 01-26-2004, 04:27 PM
CC Member
Visit my Photo Gallery

 
Join Date: Mar 1999
Location: penn.,
Posts: 2,559
Not Ranked     
Default

Concrete ain't a first time do it yourself project. I charge $4.50+ per sq.ft., depending on specification and site work required. You guys must have cheap labor avaliable. ps, what's a yard of #4000 go for in AZ? $100., with tax here in PGH.
Reply With Quote
  #6 (permalink)  
Old 01-26-2004, 04:41 PM
Senior Club Cobra Member
Visit my Photo Gallery

 
Join Date: Sep 2003
Location: Kingwood, WV
Cobra Make, Engine: SPF 2682, Roush 427
Posts: 219
Not Ranked     
Default

A garage floor of that size is not the place for a do-it-yourselfer if you want the floor smooth, level and for water to run to the drains. if you use drains out there.
Reply With Quote
  #7 (permalink)  
Old 01-26-2004, 05:05 PM
aumoore's Avatar
CC Member
Visit my Photo Gallery

 
Join Date: Mar 1999
Location: Pace, Florida, U.S.A., FL
Cobra Make, Engine: Hunter 427, 5.0 (302)
Posts: 966
Not Ranked     
Default

Mr Bruce
Do the guys driving your concrete trucks wear tailored Italian suits and talk like they have cotton balls in their cheeks?

$100/yard is tough!
__________________
Click here for DSCC website
Reply With Quote
  #8 (permalink)  
Old 01-26-2004, 05:37 PM
Ibr8k4vetts's Avatar
Senior Club Cobra Member
Visit my Photo Gallery

 
Join Date: Jan 2001
Location: Santa Barbara, Ca., ca
Cobra Make, Engine: R.U.C.C. with a 427FE, toploader
Posts: 1,435
Not Ranked     
Default

Quote:
Originally posted by aumoore


Mr Bruce
Do the guys driving your concrete trucks wear tailored Italian suits and talk like they have cotton balls in their cheeks?

$100/yard is tough!
Around here it will cost you about $120.00 for 10 yrd.
Mike
Reply With Quote
  #9 (permalink)  
Old 01-26-2004, 08:11 PM
CC Member
Visit my Photo Gallery

 
Join Date: Apr 2001
Location: Abe Lincolns Birthplace, Ky
Cobra Make, Engine: CSX4761, KCR Shelby Alloy 496,760hp
Posts: 867
Send a message via AIM to misfit41
Not Ranked     
Default

here in ky it is running about 175 a foot poured and finished,,less in a pole style building,thats 3500 lb test which is all you need in a garage,,,does not include the cost of rebar,,but it is next to nothing, 3500 lb test is about 70 a yard delivered.
I poured 900 sq feet of drive and sidewalk last spring ,a nice broom finish,lots of steel,if memory serves it cost me about 1400,but I paid fpr materials and subbed the labor.was a suoer job too,,it is easy to pay more if you dont shop around,I had the same job estiimated at 2400 bucks,that was for maybe 60 less square feet.I wouldnt try it myself,,just not worth it unless you plan to get into the biz,go to the unemployment office,find an out of work laborer you can supplement his unemployment check with a few hundred bucks and save a bunch,Tim
__________________
Tk



"this whole Adult thing just isnt working for me "
Reply With Quote
  #10 (permalink)  
Old 01-26-2004, 08:39 PM
Junket's Avatar
CC Member
Visit my Photo Gallery

 
Join Date: Apr 2002
Location: Klamath Falls, Or
Cobra Make, Engine: shell valley
Posts: 246
Not Ranked     
Default

mr bruce is correct you just don't roll up a 30x40 slab set it out for the garbage truck if you mess it up.
Get a couple of bids let them do it
Ken
__________________
Talent is your head in communication with your balls.
Reply With Quote
  #11 (permalink)  
Old 01-27-2004, 07:11 AM
Karl Bebout's Avatar
CC Member
Visit my Photo Gallery

 
Join Date: Jun 2001
Location: Mesa, AZ
Cobra Make, Engine: ERA #2119 289FIA
Posts: 5,380
Not Ranked     
Default

Sounds like you're planning a nice sized garage. You might want to check for advisability of some thicker areas or footers if you ever plan on putting in an above ground hoist. I don't know if a 5" slab would safely support the concentrated weight of the uprights supporting a vehicle. It would be pretty nasty to have the concrete give way with something up in the air. Just a thought.
__________________
Karlos
"In the Land of the Pigs, The Butcher is King"
Reply With Quote
  #12 (permalink)  
Old 01-27-2004, 08:01 AM
trularin's Avatar
Member of the north
Visit my Photo Gallery

 
Join Date: May 2003
Cobra Make, Engine: A Cobra
Posts: 11,207
Not Ranked     
Default

I think the first thing you will need to do is see if you are allowed. There are cities and twps where you need to have a licensed pro do the work.

Any way, it's not that bad. Personally I would never try to mix my own if I can get ready-mix.

Here's a quick list.
1. remove material from the site so you can have about 4 to 5 inches of sand.
2. fill with sand and level. compact with machine until hard ( walk on it and there are almost no foot prints )
3. Place expansion paper ( 3 x 3 ) against all fixed surfaces the mud will be against. Use aluminum roofing nails to secure it.
4. This next step you need to check in your state/city/county. place 6 mil plastic over the sand.
5. Unroll grid mesh wire ( 4 x 4 ) and place on floor raissed with metal raisers you get at the cement store.
6. secure path or cart to deliver mud. If you can have a truck back right in, GREAT! If your drive is paved, you will need a cart or Whitman buggy. You drive it out to the truck, they fill it with mud and then you drive it back. dump and do it all over again.
7. start at the back and work the mud to the back walls first. Bull float every four to five feet.
8. Bull float and level entire slab and wait. once it is hard enough to work, a finisher or two will get out on it and do wonderful things to the cement. If they have a power trowel, it can be really smooth.
9. Pull your forms and clean up.

You will need a minimum of :
two people as grunts
two finishers
two rolls of 4 x 4 mesh wire
19 yards of 4000 or 6000 PSI mud with 21A rock or limestone
expansion paper
roofing nails
tools for both construction and cement.
transit and levels
Mason's line
beer

Should take about two days to prep if by hand.
should take about five hours to pour and finish

Remember to slope everything to the big door.

rebar or rerod is used more for transitions, steps and mud going up. I do not think you have any of these. The mesh will hold fine.

Crack or cut your slab at 8 feet block, 3/4" down. the day after you pour. The mud will still be green and the saw will not have to work as hard.

One last thing, I can not spell, but I do know cement.

call around to find out what 19 yards of 4000 or 6000 psi mud cost, with cartage. 3500 psi mud is that bag stuff you use to put posts in the ground.

Good luck.
Reply With Quote
  #13 (permalink)  
Old 01-27-2004, 08:07 AM
trularin's Avatar
Member of the north
Visit my Photo Gallery

 
Join Date: May 2003
Cobra Make, Engine: A Cobra
Posts: 11,207
Not Ranked     
Default

I should point out that 6000 PSI cement is good for machine bases, very heavy trafic areas and garage floors where lifts and big pressure items are placed.
__________________
I'm a writer, feed the artist and buy a book.
Reply With Quote
  #14 (permalink)  
Old 01-27-2004, 10:33 AM
CC Member
Visit my Photo Gallery

 
Join Date: Apr 2001
Location: Abe Lincolns Birthplace, Ky
Cobra Make, Engine: CSX4761, KCR Shelby Alloy 496,760hp
Posts: 867
Send a message via AIM to misfit41
Not Ranked     
Default

Dont worry about the test weight of the concrete,3500 lb test is more than sufficient for a garage floor,and if you ever want a car hoist,a wood floor will support that,it is so distributed that thickness is not a factor,,4 inches is plenty with a good back fill,make sure it is sawed properly,this is the life of concrete,if it is done right, and the joints filled with silicone you will have little to no cracking.but I agree with the have it done theory,,,Tim
__________________
Tk



"this whole Adult thing just isnt working for me "
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -7. The time now is 07:12 AM.


Powered by vBulletin® Version 3.8.0
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
The representations expressed are the representations and opinions of the clubcobra.com forum members and do not necessarily reflect the opinions and viewpoints of the site owners, moderators, Shelby American, any other replica manufacturer, Ford Motor Company. This website has been planned and developed by clubcobra.com and its forum members and should not be construed as being endorsed by Ford Motor Company, or Shelby American or any other manufacturer unless expressly noted by that entity. "Cobra" and the Cobra logo are registered trademarks for Ford Motor Co., Inc. clubcobra.com forum members agree not to post any copyrighted material unless the copyrighted material is owned by you. Although we do not and cannot review the messages posted and are not responsible for the content of any of these messages, we reserve the right to delete any message for any reason whatsoever. You remain solely responsible for the content of your messages, and you agree to indemnify and hold us harmless with respect to any claim based upon transmission of your message(s). Thank you for visiting clubcobra.com. For full policy documentation refer to the following link: CC Policy
Links monetized by VigLink