
10-11-2015, 04:55 PM
|
 |
CC Member
|
|
|
Join Date: Feb 2002
Location: Alice Springs, central Australia,
NT
Cobra Make, Engine: Classic revival kit (CR3181), gen III engine, T56 6 speed box, AU XR8 lsd diff
Posts: 5,699
|
|
Not Ranked
On a purely dollar aspect, I spent about the same as PACE starter kit plus roller.
And that got me a complete car past by engineer, stamp duty paid and 12 months full rego.
Time is a hard one to figure out, as I did bits, then did it a different way, then a lot of time was also spent sitting on a chair with beer in hand and a goofy grin.
If I stripped my car down now (not dismantling engine, box and diff), I believe I could reassemble the car inside 100 hours.
But first time doing it you spend many many more.
Quote:
Originally Posted by Hoity
, you talk to the people actually building them and the final result is not that cheap purely from a dollar perspective. Then how much time is too much time, is 250-400 hr labour of love ok, is 600+ hrs too much? Two or three days a month, somewhere in 2-5+ years you have a cobra.
|
__________________
Cruising in 5th

---------------------------------------------
Never be afraid to do something new, Remember, Amateurs built the Ark: Professionals built the Titanic.
|