The interior is mostly done just four screws for the shift boot and the steering wheel center. Saved original very patina’d floor mat’s from CSX30xx. Had to redo the lift a dots on the mat’s and drill for pins. Started preparing the gas tank for installation mainly the straps that hold it in that’ll go in. I had some du-dads under there. It’s pretty much ready to go with batteries and side pipes.
Prepped the other motor for installation and the other car as well or to come on that front.