ABC: Accelerated Bridge Construction
" Connecticut DOT I-84 Bridge Replacement in Southington "
" The $6 million project to replace the I-84 bridge over Marion Avenue in Southington, which was scheduled for completion in July 2014, was finished ahead of schedule over the weekend of June 28-29 using an engineering and construction process known as ABC -- Accelerated Bridge Construction -- in which the new bridges are built adjacent to the old ones and are then lifted into place when ready."
" Only one weekend closure of I-84 was required for the replacement and installation of the two new 102-foot-long bridges weighing 2 million pounds each "
Shutdown was from Friday @ 5:00 PM until Sunday @ 9:00 PM
[ame=http://www.youtube.com/watch?v=SAAMx0W-7S8]Connecticut DOT I-84 Bridge Replacement in Southington - YouTube[/ame]
__________________
2014 Porsche Cayman S, 2014 M-B CLA 45 AMG,
Unkown:"Their sweet lines all but take my breath away, and I desire them as much for their beauty as for their use "
|